The Car

The Car
Welcome to my blog, detailing my journey to build a 2.0L Zetec based Westfield SEIW

Sunday, 2 March 2014

Something different

Trimmed and drilled the floor panels but as I don't have enough rivets to complete the two floor panels while I'm waiting for Mr Postman I thought I'd fit the pedals.

Starting with the clutch & clutch cable 



Master Cylinder

Brake pedal

Throttle pedal


 Throttle cable

and finally the three-way union complete with brake switch


No comments:

Post a Comment