The Car

The Car
Welcome to my blog, detailing my journey to build a 2.0L Zetec based Westfield SEIW

Sunday, 9 March 2014

Pipes and 'final' panels

Completed the two floor panels, then ran the fuel and brake lines from front to back. Where the line clips are attached to the chassis rails I used rivets and where they attached to the floors I used M5 dome head screws with nyloc nuts. 


For the fuel lines I've used plastic covered 8mm copper LPG high pressure pipe (same as used for dual fuel cars).  










No comments:

Post a Comment