The Car

The Car
Welcome to my blog, detailing my journey to build a 2.0L Zetec based Westfield SEIW

Saturday 29 March 2014

Wiring

First job was to layout the loom and label the connections.


Including the two fuse carriers and which have to be disconnected to pass through the bulk-head








Sunday 9 March 2014

Pipes and 'final' panels

Completed the two floor panels, then ran the fuel and brake lines from front to back. Where the line clips are attached to the chassis rails I used rivets and where they attached to the floors I used M5 dome head screws with nyloc nuts. 


For the fuel lines I've used plastic covered 8mm copper LPG high pressure pipe (same as used for dual fuel cars).  










Sunday 2 March 2014

Something different

Trimmed and drilled the floor panels but as I don't have enough rivets to complete the two floor panels while I'm waiting for Mr Postman I thought I'd fit the pedals.

Starting with the clutch & clutch cable 



Master Cylinder

Brake pedal

Throttle pedal


 Throttle cable

and finally the three-way union complete with brake switch