Completed the two floor panels, then ran the fuel and brake lines from front to back. Where the line clips are attached to the chassis rails I used rivets and where they attached to the floors I used M5 dome head screws with nyloc nuts.
For the fuel lines I've used plastic covered 8mm copper LPG high pressure pipe (same as used for dual fuel cars).