The Car

The Car
Welcome to my blog, detailing my journey to build a 2.0L Zetec based Westfield SEIW

Sunday 4 May 2014

Stoneleigh 2014

Next tranche of parts ordered or brought at Stoneleigh including:


  • Steering rack, mounts and track-rod ends
  • Lower steering coloum
  • Protec shocks
  • Top and bottom ball joints
  • Front & rear High-Spec callipers
  • Front uprights and hubs
  • Lobo joints and stubs
  • Hand-brake lever

once the parts arrive it's on with the show!

Got some good deals and meet a few people in the WSCC.











No comments:

Post a Comment